Safe and civilized construction fee includes safe and civilized construction fee calculation methods

What are the safety and civil construction fees? Today we come to understand the relevant content of the safe and civilized construction fee, as well as to see how safe and civilized construction costs are calculated. I hope to be helpful!

What are the safety and civil construction fees? (Civilized construction costs, environmental protection fees, temporary facilities, and safety construction costs)

1, civilized construction and environmental protection

(1) Safety warning signs; Set obvious safety warning signs that meet the requirements of national standards at the accident-prone (or dangerous) accidents.

(2) On-site enclosure; On-site adopting enclosed enclosure, height not less than 1.8 meters, wall material of color, shaped steel plate, brick, concrete block, etc.

(3) Brand map; Hanging project overview, management staff list and supervision telephone, safe production, civilized construction, fire protection five boards, and general floor plan of construction site at the entrance.

(4) The company logo; The entrance to the scene should be provided with the corporate logo or corporate logo.

(5) Field appearance; smooth roads, drainage channels, unobstructed drainage facilities, ground-hardening treatment on site, and greening.

(6) Stacking of materials; stacking of materials, components, materials, etc., hanging signs with names, varieties, specifications, etc. Cement and other flying fine particles should be sealed or covered. Flammable, explosive and toxic and hazardous materials are classified and stored.

(7) On-site arson; the fire-fighting equipment is properly configured and meets the fire-fighting requirements.

(8) Garbage removal and transportation; Closed garbage stations should be set up on the construction site; construction waste and domestic waste should be classified and stored.

2. Temporary facilities

(1) On-site office living facilities; the construction site office, living area and work area are separately set up to maintain a safe distance. Site offices, on-site dormitories, canteens, toilets, drinking water, and rest places meet hygienic and safety requirements.

(2) Temporary power supply at the construction site; Five-core cable, four-core cable and three-core cable in accordance with the TN-S system requirements; erection of poles, crossarms, porcelain clips, porcelain vases, etc., or cables for temporary electricity lines as required Underground trenches; protective facilities such as wood and plastic insulators are installed on the external power lines close to the construction site; three types of standard electrical boxes are allocated to the total distribution box, distribution box, and switch box according to the three-level distribution requirements. Switch box should meet a machine, a box, a brake, a drain. All types of electrical appliances in the three types of electrical boxes shall be qualified; according to the requirements of two-level protection, leakage protection devices shall be selected in the main distribution box and switch box that meet the requirements for capacity and quality; repeated grounding of the protective zero line at the construction site It should be no less than three.

3, safe construction

(1) Slabs, roof and balcony lights on the edge of the protection; with a dense mesh safety net closed, plus two layers of protective railings and 18cm skirting board.

(2) Access port protection; a protective shelter shall be provided, and the protective shelter shall be a board not less than 5cn thick or two bamboo poles 50cm apart. Both sides should be closed along the railing with a dense mesh safety net.

(3) Preserve the protection of the entrance; use wood planks to be closed, the short side exceeds 1.5m in length, and protective railings shall be provided in addition to the perimeter of the enclosure.

(4) Lift wellhead protection; set fixed, tooled and standardized protective doors, and set a safety net every two floors (not more than 10 meters) in the elevator shaft.

(5) Stair protection; 1.2 meters high fixed, tooling, standardized guardrail, 18cm skirting board.

(6) Cross-operation protection in the vertical direction; protective shelters or other facilities are provided.

(7) Aerial protection; hanging ropes or other facilities with suspended safety belts, operating platforms, up and down ladders, or other forms of access.

How to Calculate Safe and Civilized Construction Costs

The safety protection of civil engineering construction and civilized construction measures are composed of environmental protection fees, civilized construction fees, safety construction fees, and temporary facilities fees included in the “construction and installation project cost components” in the measure fee:

1. Environmental protection fee: Environmental protection fee = direct engineering fee × environmental protection fee rate (%)

2. Civilized construction fee: Civilized construction fee = direct engineering fee × civilized construction fee rate (%)

3. Safety construction fee: safety construction fee = direct engineering fee × safety construction fee rate (%)

4. The temporary facilities fee consists of the following three parts:

(1) Use of temporary construction (eg, mobile home)

(2) One-time use of temporary building (eg, simple building)

(3) Other temporary facilities (for example, temporary pipelines)

Temporary facility fee = (turnaround construction fee + one-time temporary construction fee) × (1 + proportion of other temporary facilities)

Turnaround use construction fee = ∑ [(Protective area × unit price) ÷ (use life × 365 × utilization rate) × construction period (day)] + one-time removal fee

One-off temporary construction fee = ∑ [pro-building area × unit price × (1-residual value rate)] + one-time demolition fee

Summary: The relevant information on the safe and civilized construction fee and the method for calculating the safe and civilized construction fee are introduced here for everyone. I hope the efforts of Xiaobian can help you. If there is anything we don’t understand, we can give it below. Xiaobian message, we will answer your questions as soon as possible, this site will provide everyone with more comprehensive, more detailed, updated information information.

Construction installation decoration construction knowledge construction delivery construction contract

This is Pure Carbon Fiber Sheet. Carbon Fiber Sheets are fabricated with multiple layers of high strength carbon fiber prepreg using a high pressure, which are widely used in Aviation,Drone,DIY etc. Because they are high strength,light weight,wear-resisting,Corrosion Resistant etc. Our Quasi-isotropic plate, 100% carbon fiber sheets, carbon glass sheets and G10 glass fiber sheeets are designed for use in constructing high performance structures and are easy to cut, drill and assemble.
Twill/Plain,Matte/glossy finish are available. Customized size and shape are available as well.We could offer Cnc Cutting Service incluing regular cutting, countersinking and chamfers etc with beautiful surface and high precision.

Just enter your request in the Request Special Services section on the product page when interesting in a product, and pricing will be emailed for approval.

carbon fiber sheet

Carbon Fiber Sheet

Carbon Fiber Sheet Product,Carbon Fiber Sheets,Carbon Fiber Plates,Carbon Fiber Boards

Hobby Carbon CNC Technology(Shenzhen) Limited , https://www.hobbycarbon.com