Mid-term acceptance of the decoration and mid-term acceptance skills

Mid-term acceptance of the decoration and mid-term acceptance skills

Mid-term acceptance generally accepted those places?

During the mid-term acceptance period, in addition to identifying the overall effect of the renovation, it is mainly to judge the quality of the project. Acceptance can be identified in the following ways:

(1) The lighting circuit shall be laid in accordance with the regulations. The socket, lighting switch, main gate, leakage switch, etc. shall have a certain height, the kitchen and air-conditioning must be laid in dedicated lines, and the television antenna and telephone line shall be installed in a position convenient for maintenance.

(2) Drainage should be smooth, no leakage, backflow, and stagnant water phenomena, high-grade water parts without clamp marks and rubbing phenomenon.

(3) It is the new masonry wall that is to be vertical, the same level of the brick body, the joints are even and tidy, the brick seam does not exceed 1mm, and the overall tile error is not more than 0.8cm.

(4) It is the overall production error of the plane ceiling that does not exceed 0.5, the crack between the board and the board does not exceed 0.3mm, and the error of the plastic ceiling does not exceed 0.5mm.

(5) It is not more than 0.2mm for wood seal line, corner line, and waistline veneer. The angle between line and line mouth is not more than 0.3mm, and the interface between veneer and plate is not more than 0.2mm. Not exceed 0.3mm.

(6) The paint should be smooth, feel good, no traces of scratches, no color difference and nailing within one meter.

(7) It is the straight line of the wall surface, and there is no obvious convexity and color difference within one meter. It is used to wipe off the dust. The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria.

Tip: In the mid-term acceptance, the customer, the designer, the project supervisor, and the person in charge of the construction must be involved. After the acceptance, the quality report will be signed and confirmed. At the end of acceptance, it requires the participation of customers, designers, project supervisors, and construction managers. The overall acceptance of the engineering materials, design, and process quality will be confirmed after the inspection. In order to satisfy both the decoration company and the consumers, consumers can determine whether the decoration of their home is qualified according to the "Quality Acceptance Regulations for Home Decoration Projects" compiled by the Municipal Building Decoration Industry Association. If there is an objection, it must be coordinated and processed before signing the “Quality Report after acceptance”.

Renovation Steps Windows Decorations Sockets Home Decorations Flooring Tiles Kitchens Sliding Doors Kitchen Cabinets Doors Kitchen Doors Upscale Tile Flooring Tiles Kitchen Tiles ld Tiles

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story