Three reasons for ground cracking and preventive measures

Precaution:

Before laying the marble, understand the form of the ground structure, observe whether the structure is a rigid body, whether the cushion with the cushion is hollow or cracked. When laying the stone on the expansion joint of the building and the settlement joint, it is necessary to select the corresponding method according to the atlas. The construction of the disconnection must be disconnected, and it should not be simple and straightforward.

Second, the natural defects of marble. Some marbles have many natural defects, such as cracks, sand holes, loose, and sandwiches.

If these defects are not repaired and compensated in advance, once they are laid on the ground and exposed to moisture and some harmful pollution, they will be the first to cause lesions and damage in the defective parts and thus expand, like silver line beige, Gold flower beige, brown net and so on.

Precaution:

1 In the selection of ground marble materials, we should give correct opinions to Party A according to the characteristics of the stone. Stones with softer stone materials such as wood grain and stone, such as gold century beige and other stone cracks, are not easy to choose. Used as ground stone;

2 Before carrying out the stone paving, it is necessary to inspect the board surface and find that there are dark cracks, clips and other stones with quality hazards to be removed;

3 In the construction of large-scale ground stone, it is best to leave a natural seam of 1~2mm between the plate and the plate. Do not completely cover the seam to prevent the stone from cracking due to the temperature difference and the internal water pressure of the stone.

Third, the external damage caused the ground stone to crack, including improper construction techniques, and the pressure during use was too large.

Precaution:

When paving stones, you should use a rubber hammer to strike the stone. The tapping force is appropriate, and it is easy to lightly knock and spread. The marble floor during use, due to the pressure of exceeding the load, will also cause the ground to crack. It should be prohibited. When the project is written in the completion stage, it should be explained.

[Scan the QR code below, pay attention to the WeChat public number " Jiuzheng Stone Network" ; you will receive the latest stone news, information, business opportunities! What are you waiting for? Join the official Jiuzheng Stone Group: 361378009/65406142 】

Aluminium Strip

Aluminium Strip,3003 Aluminum Strips,Aluminium Strip For Piping,Aluminum Strips With Narrow Width

Zhengzhou Yearshine Industry Co., Ltd , https://www.zzyscorp.com