Ten places to install home improvement engineering team cut corners

First stroke: Latex paint <br> Stealing index: ★☆
Phenomenon: Latex paint is the most common wall decoration material. It can be painted, rolled or sprayed in specific construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur.
Experts advise: Before the use of latex paint to add a certain amount of water, deployment of a good latex paint to run out. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.
2nd trick: Sewer Pipeline <br> Stealing Worker Index: ★★
Phenomenon: During the renovation of the construction team, in order to save time, a large amount of concrete, sand, and concrete fragments are poured into the sewer. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problems in the final acceptance, they always have problems with poor water.
Experts advise: Strict supervision of the construction team, can not use the sewer as rubbish use. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then water-proofed to see if the water is unobstructed and the pipeline is leaky.
3 strokes: wire connectors <br> steal workers Index: ★★ ☆
Phenomenon: When the electrician installs sockets, switches, and lamps, it does not wire according to the construction requirements. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, causing great losses to consumers.
Experts advise: In the construction of supervision of electricians in strict accordance with the operating procedures for construction, after all the switches, sockets installed, be sure to carry out the actual use to see if these parts have a fever phenomenon.
4th trick: wall tile stickers <br> sharking index: ★ ★ ★
Phenomenon: Paving tiles is a technical process. If workers cut corners, they are most prone to problems such as hollowing of tiles and misalignment of the tiles. In addition, the cement and adhesive used for laying tiles are also delicate. If the mix is ​​unreasonable, the tiles will fall off.
Experts reminded: According to the Beijing Construction Committee issued the "family home decoration project quality acceptance standards," require tile paving should be flat and solid, clear patterns, no dirt and paste marks, the surface color is basically the same, uniform seams, plate crack-free , drop angles and missing edges, local emptying may not exceed 5% of the total.
5th stroke: wall nicking <br> 偷工指数:★★★☆
Phenomenon: The buried pipeline must be slotted on the wall and the ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines.
Experts advise: Before construction, we must reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing trouble to the residents downstairs.

6th trick: seam modification <br> Steal workers index: ★ ★ ★ ★
Phenomenon: In some places where the wall meets the door and the window, and where the two different colors of paint are docked, it is also where the workers often perfunctory. You will often see mixed paints between latex paint and wood, with various problems at the joints.
Experts advise: The treatment of joints is very important, you must supervise the workers to seriously construct. If there are two colors of paint on the wall facing each other, it is necessary to apply adhesive tape on the edge of the first color during construction, and then apply another color of paint on it, so that the construction is completed. After tearing off the tape, the entire seam can be very neat.
The 7th move: Wire wear pipe <br> Steal workers index: ★ ★ ★ ★ ☆
Phenomenon: In the home improvement construction, almost all wires are put in PVC pipes and buried in the walls. Therefore, after the electric wire is put into the PVC pipe, the consumers cannot see it at all and it is difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If the workers intentionally cut corners, they would use wire with connectors or put several wires in the same PVC pipe.
Experts advise: Consumers are advised to purchase their own wires, then supervise workers' operations at the site, and conduct power-on tests after installation. In addition, consumers must allow the decoration company to leave a "pipeline map." When the electrician had just buried the wires in the wall, he could number the walls and draw a floor plan. Then he used the strokes to draw the direction of the wires and the specific location of the wires, indicating the position on the floor, the ground and the adjacent wall. In particular, the position of the joints of the pipelines should be marked so that in the event of a fault, the line position can be found immediately.
8th move: facet processing <br> 偷工指数:★★★★☆
Phenomenon: The so-called "small face" is a small place that some consumers can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window sill, and the inside of the heating cover. Some workers will be here. If you cut corners, you will not even do anything.
Experts advise: Remember that there are 6 planes for any object. Don't ignore any details when checking the quality of the project.
9th trick: Ground Leveling <br> Stealing Workers Index: ★★★★★
Phenomenon: Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevenness”, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building.
Experts advise: Before ground leveling, ground surface treatment must be done first, and then use cement mortar to level the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler, and then proceed to the next step.
10 strokes: Substrate Treatment <br> Stealing Index: ★★★★★
Phenomenon: Before applying latex paint and paving wall tiles, be sure to do the substrate treatment. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded.
Experts advise: In the construction of paving tiles, you should pay attention to the fact that ceramic tiles cannot be laid directly on the surface of lime mortar, lime paste, lime plaster, hemp plaster and latex paint. Can be laid. Bonding pastes used between tiles and substrates should be formulated in strict accordance with the construction standards and proportions, using the specified grades of cement and adhesive materials, and they cannot be randomly deployed.

Three Trees Lacquer Tiles Lacquer Paints Cement Paint Switches Bathroom Tiles Color Toilets Waterproof Bathroom Tiles Bathroom Tiles Bathroom Doors Tiles Tiles Kitchen Tiles

Outdoor Furniture

Outdoor Furniture,PVC Decking ,Composite Wood Decking ,Plastic Decking Boards

Wood Plastic Composite Flooring Co., Ltd. , http://www.china-wpc-decking.com