Hebei Province steel cement flat glass total control plan introduced

/*kangxianyue 250*250 was created on 2017/3/29*/ var cpro_id = "u2939694";

The production capacity of steel, cement and flat glass will be controlled at 200 million tons, 220 million tons and 260 million weight boxes before the end of March. The comprehensive cleaning, cement and flat glass industries have established illegal production capacity.

Recently, Hebei Province issued the “Implementation Plan for Resolving the Serious Overcapacity of Production Capacity”, and proposed the total control target for the three industries of cement and flat glass. With about 8 years, the production capacity will be controlled at around 200 million tons. By 2017, the cement production capacity will be controlled within 220 million tons, and the flat glass production capacity will be controlled within 260 million weight boxes. Before the end of March, Hebei Province, with districts and municipalities directly under the county (city) as the unit, comprehensive clean-up, cement, flat glass industry has built illegal production capacity.

All shut down independent iron-making and independent converter steelmaking enterprises that do not meet the requirements of energy conservation and emission reduction

The "Proposal" proposes that Hebei Province will use about 8 years to control the production capacity to about 200 million tons (by 60 million tons in 2017 and 220 million tons in the first five years). At the same time, all independent ironmaking and independent converter steelmaking enterprises that do not meet the requirements of energy saving, emission reduction and safe production are shut down, and blast furnaces of 450 cubic meters or less and converters of 40 tons and below are eliminated.

The cement industry will overtake the national task of eliminating backward cement production capacity during the “Twelfth Five-Year Plan” period. By 2017, the clinker production capacity will be controlled within 90 million tons, and the cement production capacity will be controlled within 220 million tons. The pressure on the flat glass will be reduced and eliminated by 30 million weight boxes. By 2017, the production capacity will be controlled within 260 million weight boxes.

New production capacity projects in industries such as cement, flat glass, etc. may not be approved (recorded)

Before the end of March, the districts and municipalities directly under the county (city) as the unit, the comprehensive clean-up, cement, flat glass industry has built illegal production capacity. For the provinces that have not fulfilled the formalities or procedures in accordance with laws, regulations, such as land, environmental protection and investment management, the cement and flat glass industry projects are registered and registered, and will be classified before the end of June. Unauthorized illegal projects shall not be started, and illegal projects that have not been in compliance with industrial policies, access conditions, and environmental protection requirements shall be suspended. If it is necessary to construct and meet the requirements of planning layout and environmental carrying capacity, on the basis of implementing equal or reduced replacement capacity, the local government shall apply for it, and the relevant procedures shall be re-submitted by the state, and no approval shall be made. For projects that are under construction that are concealed and not reported, once they are verified, they will be suspended immediately. Financial institutions will stop issuing loans and conduct administrative accountability for the responsible persons at the project site.

The "Proposal" also proposes that all localities and departments must not approve (record), cement, flat glass and other new capacity projects in any name and manner, and must not handle land (sea area) supply, energy assessment, environmental assessment approval and new credit support. Business, it is strictly forbidden to build new capacity projects. Encourage citizens and enterprises to report the illegal construction projects of overcapacity industries.

If necessary, the resource environment carrying capacity will be forced to exceed the standard capacity.

The "Proposal" proposes to create a fair environment, further reduce administrative intervention, ensure that all types of ownership economies use production factors in an equal manner, participate in market competition fairly, and are equally protected by law. Clean up and abolish land, resources, taxes, and electricity prices adopted in attracting investment. And other preferential policies that impair fair competition.

Implement and improve the differentiated price policy, strictly implement the energy consumption, material consumption, water consumption and ecological environmental protection standards for cement, flat glass industry access. If necessary, Hebei Province can set local standards higher than the above standards, with resource and environmental carrying capacity. The upper limit is forced to exceed the standard production capacity, energy conservation and emission reduction standards and ecological environment improvement. The land used by the cement, flat glass production enterprises shall be thoroughly inspected, and the projects that have not been approved or filed shall not approve the newly used land and shoreline. No preferential policies for land use shall be given to the cement, flat glass industry projects.

G100 Rigging Hardware

Connecting Link Coupling,Connecting Link,Safety Hook,Lifting Hook

Shandong Shenli Rigging Co.,LTD. , https://www.liftinghook.nl