How to decorate the house? The correct steps for renovation

Now all of us will meet the time when we have to repair the house. When we don’t roll, we will give the son a wedding, or if they want to live and live in good condition, they will decorate the house, but how do we decorate a beautiful and nice house? Look at the small steps to introduce you to the house how to decorate some of the methods and steps, I hope you can learn, will not worry too much when decorating the house.


房子如何装修


One of the things we have to do in the early design is to make a detailed measurement of your room, which is more accurate than the purchase of building materials, and it is more immune to hacking during settlement:


The first step, the main contents of the measurement include:


1. Identify the area involved in the renovation process. Especially the tile area, wall paint area, wallpaper area, floor area.


2. Identify the main wall dimensions. In particular, it is necessary to design the wall size of the furniture in the future.


The second step, hydropower transformation


Between the two aspects of hydropower transformation and main body demolition, some rookies may know that the first measurement of the cabinet, the location of the hood socket, and some relevant suggestions should be made. mainly include:


1. Look at the location of the hood socket to affect the installation of the hood later.


2. Look at the location of the water meter.


3. Check if the position of the water outlet is convenient for installing the sink later.


The third step, kitchen, bathroom waterproof


1. For the first measurement of the cabinet, a slightly experienced rookie can do it himself. After the completion of the waterway renovation, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof.


2, there are rookies have always thought that before the start of the renovation, some of the main ingredients should be in advance.


3. What we have to say is that unless it is the main material needed for the main body to be dismantled, the entry time of the main materials such as ceramic tiles and large core plates should be after the hydropower transformation.


4. Because the circuit transformation involves ground slotting, if the position of the tile and the large core board is not properly installed, it is very troublesome for the workers to move in and out.


The fourth step, wall cement


If the workers are too busy, the foreman will usually let the "Mason" go to the bricks when the "woodworking boss" is not over. This is normal because there is no conflict between the two, "Mason second" operation. The process also involves the installation of the following three links:


房子如何装修


1. Installation of door stone and marble window sill. The installation of the stone can be done with the paving slabs. After the paving slabs, the installation of the marble sills is usually done after the window sills are completed. The marble workers will prepare the glass glue and seal the marble and window coverings with glass glue. It is.


2. Installation of floor drains. The floor drain was the first to appear in the home improvement hardware because he had to work with the floor tiles. Therefore, when rookies start to visit the building materials market, they should buy floor drains early.


3. Installation of the hood. The range hood is the first to appear in the home appliance. After the kitchen wall and floor tiles are laid, you can consider installing the range hood.


"Mason second child" left the scene, this time can be measured about the second time of the cabinet. Accurately, after the kitchen wall tiles are installed and the hood is installed, the cabinet can be measured for the second time.


Ok, have you finished reading with Xiaobian? The above is a small series. I want to tell you in detail about the correct construction steps for us when we are decorating the house. Everyone will see it? Xiaobian here also has more related decoration consultations for our decoration home network. Everyone can pay attention to it at any time, and can help us to publicize it. Our website really wants every friend to be in the decoration. Get the most help.



More related wonderful reading:

How much is a hundred square meters house decoration? How to decorate the house to save money?

How to decorate a small area house? Small area house decoration renderings

Grey Marble series-cloudy Grey marble, we produce three kinds of cloudy grey marble: cloudy grey , cloudy grey (brown), cloudy grey (white).grey marble is hot sale around the world,especially these two years.grey marble background is very suitable for wall and floor tiles,inside or outside.we mostly produce slab and tiles,you can purchase grey marble slab to produce grey marble countertops-which you prefer.


We call this Cloudy grey marble ,we mainly produce slab and tiles:

1: slab, thickness 1.6/1.8/2/3cm

2.tiles,normal 61*30.5cm/30.5*30.5cm,thickness normally 10mm,custom size is welcome.

Surface: polished, honed,

Supply Ability: 5000 square meters per month.

Uniqueness: strict Processing standard, size tolerance standard, crystal lines standard, 100%  Inspection before shipping,very stable on supply.

Grey Marble

Grey Marble,Grey Marble Texture,Grey Marble Floor,Grey Marble Kitchen

Fuzhou HuaRen International Imp&Exp.Co,Ltd , https://www.huarenstone.com